KIEV — A huge hydraulic excavator is grabbing a coat of grey muck and loading it on barges, which transfer the waste to the dump site - Ukraine's Black Sea port of Yuzhny is in the midst of the major dredging operation.
They have already removed about 1.7 million cubic meters of muck from the Yuzhny bottom, completing about 25 percent of the first part of the dredging project.
========================================================
部分内容来自网络,如有版权问题请与我们联系
未经许可,严禁转发。QQ交流群:688169419
========================================================